​​Sample ECO - To reallocate the loading pattern of different transformers


Present Status
Presently there are 8 numbers of transformers in the plant. Most of the transformers are underloaded.

Modification Proposed
Transformers operate with maximum efficiency when they are loaded at 50 to 70%. The transformers are loaded very much below the rated kVA i.e. 359 against 1250. It is recommended to install a lower capacity transformer of 750 kVA. The transformer (750 kVA) can be used for this purpose.

The annual savings in reallocating the loading pattern of transformer in the plant is Rs.7,410.


Transformer Loading:

Transformer              Rated kVA             Voltage              Current           Loading kVA           Loading %
      1                               2000                      440                     375                  285.78                      22.86
      2                               2000                      440                     375                  285.78                      14.28
      3                               2000                      440                   1200                  914.94                      45.72
      4                               2000                      440                   1280                  953.29                      47.66
      5                               2000                      440                     725                  552.50                      27.62
      6                               2000                      440                     640                  465.56                      23.27
      7                               1250                      440                     471                  358.87                      28.70
      8                               2000                      440                     755                  575.55                      28.75

Savings obtained by reallocating transformer loads for transformer No.7 :

Existing average load            =  358.87 kVA


Existing transformer rating    =  1250 kVA


Percentage loading               =  28.70%


Recommended T/F rating
with respect to average load =  750 kVA